Best Solar Installers in Gyalshing, Sikkim

Compare 7 PM Surya Ghar approved solar EPC companies empanelled with Sikkim Power Dept.. Avg. tariff ₹4/unit · Subsidy up to ₹85,800.

Showing 1 verified solar installers in Gyalshing

All installers background checked & verified

Rooftop solar in Gyalshing — quick answers

How much does a 3 kW rooftop solar system cost in Gyalshing?

Listed installers in Gyalshing start at about ₹60,000 per kW, so a 3 kW on-grid system costs roughly ₹1,80,000 before subsidy. After the ₹85,800 PM Surya Ghar subsidy, you pay about ₹94,200. Final prices depend on panel brand, structure height and a site survey.

How much solar subsidy can I get in Gyalshing?

Under PM Surya Ghar: Muft Bijli Yojana, homes in Sikkim get ₹33,000 for 1 kW, ₹66,000 for 2 kW and ₹85,800 for 3 kW or more, paid directly to your bank account after installation and net-metering by your DISCOM.

Which DISCOM handles net metering in Gyalshing?

Rooftop solar net metering in Sikkim is handled by Sikkim Power Dept.. Your installer applies on the national portal, the DISCOM inspects the system and installs a bi-directional net meter.

How much electricity does rooftop solar produce in Gyalshing?

Each 1 kW of rooftop solar generates about 120–130 units a month in Sikkim, so a 3 kW system makes roughly 360 units monthly. At the average residential tariff of ₹4/unit, that saves about ₹1,440 a month.

How many solar installers are listed in Gyalshing?

There are 1 rooftop solar installers listed for Gyalshing on this page. Compare their ratings, price per kW and installed capacity, then request free quotes from 2–3 of them.

Can't find the right installer?

Tell us your requirements and we'll connect you with the best verified solar installers in your area.

It's free and takes less than 1 minute

PM Surya Ghar: Muft Bijli Yojana Official Subsidy Calculator

Calculate Your Solar System Size & Subsidy Savings

Enter your typical monthly electricity bill to calculate required rooftop area, government subsidy amount, and 25-year lifetime return in Sikkim.

₹
₹800/mo(1-2 BHK)₹3,500/mo(3-4 BHK with ACs)₹10,000+/mo(Villas / Commercial)
Recommended Size — —
Estimated Gross Cost — Tier-1 High-Efficiency TOPCon
Govt. Central Subsidy — Direct Bank Transfer (DBT)
Net Cost Payable — —
Annual Power Savings—Practically Zero Monthly Bills
Payback ROI Period——
25-Yr Net Savings——

Matched with DISCOM empanelled installers in your area • 100% Free & No Obligation